THE USE OF VIBRA ENGINE TO ENHANCE BATAKO INDUSTRIAL QUALITY AT URBAN AREA Kuryanto, Totok Dwi; Irawati, Irawati; Rizal, Nanang Saiful
Kontribusia (Research Dissemination for Community Development) Vol 1 No 1 (2018)
Publisher : Universitas Muhammadiyah Gresik

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30587/kontribusia.v1i1.250

Abstract

The main objective of the Technology for the Society (IbM) is aimed at addressing the main problems faced by approximately 200 urban poor, namely: (1) The location of the residence located on the edge of the city with a distance society of about 10 km from urban areas. (2) Low economic level or low income about Rp.600.000 / month so it can not meet the basic needs and lift the economy of the surrounding community. The specific target in this IbM program is to apply Batako engine utilization technology to improve the quality and quantity of local Batako production of marginalized urban communities which originally produced only Batako blocks of about 200 seeds to 1000 seeds per day and increased concrete compressive strength. from 175 Kg / cm2 to 225 Kg / cm2, thereby increasing employment for the surrounding communities and increasing the income of business actors and partner workers. The method of implementation to solve the problems of the program partners of IbM is to increase the added value of community income through the utilization of Batako chili type which includes the stages: (a) Thesocialization of Batako IbM program; (b) Preparing social prerequisites, such as strengthening rural community groups, groups and forums as a medium to meet and solve problems faced by farmers or the poor; (c) Implementation of Batako IbM program, supported by related institutions (Dinas Cipta Karya Kabupaten Lumajang and University (Faculty of Engineering, Muhammadiyah University of Jember), and (d) Monitoring, evaluation and reporting.
EVALUASI PERCEPATAN PEMBANGUNAN PROYEK RUSUNAWA ASN PEMKAB MALANG MENGGUNAKAN METODE CRASHING DENGAN SISTEM SIHFT KERJA Apriliana, Ninda Rizki; Gunasti, Amri; Kuryanto, Totok Dwi
HEXAGON Vol 5, No 1 (2020): HEXAGON
Publisher : Universitas Muhammadiyah Jember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32528/hgn.v5i1.3584

Abstract

In construction projects there are three things that must be considered, namely time, cost and quality. However, reality shows that there is still often a delay time of implementation. One way to overcome delay in construction projects is to do with the crashing. This research was conducted on the project of the construction of the building Rusunawa ASN Malang Regency. The method of crashing used by wayof a work shift. The calculation of the needs of the work shift using the guidelines for the calculation of Unit Price Analysis of Workers (AHSP) in 2018. The results showed that the project can be accelerated for 24 working days, so the duration of the project which was originally 197 working days to 173 days of work. Direct costs the project has increased from Rp.12.763.192.497.58 in 197 days to Rp. 12.937.000.000.00 in 173 days (up 1,3554%).