ANALISIS PENENTUAN SETTING DISTANCE RELAY PENGHANTAR SUTT 150 KV GIS PESANGGARAN – GI PEMECUTAN KELOD Hidayatullah, Kholid; Sari Hartati, Rukmi; Sukerayasa, I W
Jurnal SPEKTRUM Vol 6 No 1 (2019): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (239.706 KB) | DOI: 10.24843/SPEKTRUM.2019.v06.i01.p19

Abstract

The addition of UGC cable (Under Ground Cable) and equipment rating’s change for the reconfiguration from Air Insulated Swichgear into Gas Insulated Switchgear at Pesanggaran substation. Therefore need to reset distance relay settings so that relays can work more selectively and reliably. Using manual and simulation calculations, the results obtained from distance relay reset GIS Pesanggaran - GI Pemecutan Kelod, with impedance value 1 = 2.055 ?, zone 2 = 5.73 ? and zone 3 = 11.01 ? with time delay at zone 1 = 0 seconds, zone 2 = 0.4 seconds and zone 3 = 1.6 seconds. This setting shows that the reload setting value can secure the line from the 3 phase short circuit fault obtained from the simulation results.
DESAIN INSTALASI LISTRIK UNTUK PERLUASAN FAKULTAS TEKNIK UNIVERSITAS UDAYANA KAMPUS SUDIRMAN Paramarta Dwi Parna, Kadek; Sari Hartati, Rukmi; Janardana, I Gusti Ngurah
Jurnal SPEKTRUM Vol 6 No 4 (2019): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (242.522 KB) | DOI: 10.24843/SPEKTRUM.2019.v06.i04.p3

Abstract

Tujuan dari penelitian ini adalah merencanakan sistem kelistrikan untuk penyediaan daya di gedung AF Program Studi Teknik Elektro Fakultas Teknik Universitas Udayana Kampus Sudirman serta lift yang akan dipasang di gedung C. Berdasarkan hasil perhitungan, diperoleh jumlah titik lampu sebanyak 163 titik, kotak kontak 165 titik, AC sebanyak 52 buah, beban total untuk gedung AF sebesar 82.410,11 VA ditambah dengan beban lift sebesar 12.000 VA sehingga beban total menjadi 94.410,11 VA dengan diversity factor 65%, total daya yang dibutuhkan adalah 61.366,5715 VA. Untuk sistem pembumian, jika menggunakan sistem pembumian elektroda batang bertipe 1 rod dengan kedalaman 14 meter mengunakan pembumian bertipe 2 rod S < L dengan kedalaman masing-masing rod 8 meter dan 2 rod S > L dengan kedalaman masing-masing rod 6 meter. Jika menggunakan sistem pembumian bertipe pelat dibutuhkan 2 buah pelat. Perencanaan lift yang direkomendasikan dengan kapasitas 1050 Kg dengan daya sebesar 14,0 kW.
ANALISIS KEANDALAN DAN SUSUT DAYA PENYULANG TABANAN SETELAH REKONFIGURASI Al Farisi, Salman; Sari Hartati, Rukmi; Sukerayasa, I Wayan
Jurnal SPEKTRUM Vol 5 No 2 (2018): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (274.337 KB) | DOI: 10.24843/SPEKTRUM.2018.v05.i02.p17

Abstract

The need for electricity in this global era is increasing, so that a more reliable electrical system is needed. A reliable system cannot be separated from interference, so there needs to be a system reliability analysis and power loss to the feeder by configuring the network. This research was conducted to find the reliability index value in the form of interference frequency and duration of interference (SAIFI and SAIDI). In one Tabanan feeder the results obtained exceed the standard so reconfiguration is performed Based on the analysis obtained before reconfiguration, the reliability index for SAIFI is 6,7456 (failure / year) and SAIDI is 11,4767 (hour / year) and power loss by 6,27 %. After reconfiguration of Tabanan feeder, the reliability index was better, for SAIFI is 5.2475 (disturbance / year) and SAIDI is 9,8798 (hour / year), the power loss was 2.82%. Sanggulan feeder is a new feeder reconfiguration result from Tabanan feeder, where the analysis was carried out to find out the reliability index of Sanggulan feeder, it was obtained the SAIFI value of 4.5753 (disturbance / year) and SAIDI of 9.5297 (hour / year) and power loss of 4,80%.
Ergonomic Redesign of Computer Laboratory to Improve Electric Power Performance and Working Efficiency Wijaya, I Ketut; Adi Putra, I Nyoman; Sutajaya, I Made; Sari Hartati, Rukmi
INDONESIAN JOURNAL OF BIOMEDICAL SCIENCES Vol. 5, No. 1 Januari 2011
Publisher : Udayana University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (241.679 KB)

Abstract

The current problems in the Computer Laboratory of Udayana UniversityTechnical Engineering Faculty include non-standard room temperature of 28 0 C, nonstandardlight intensity average in the room of 110 lux, seat height of 43 cm and tableheight of 74,50 cm being not adapted to the workers’ anthropometric measurements, anddazzling white-colored curtains. Baseline data on six students after 3-hour workingrevealed the following findings: eye fatigue 81%’ and general fatigue 88%;musculoskeletal complaints 51%; average learning achievement 59.5%, performance16.25%, and efficiency 10.09%. In an effort to improve the working conditions, a totalexperimental ergonomic intervention in the form of redesigning the Computer Laboratorywas introduced.In this study 30 subjects were recruited. The data collected were analyzed by usingdesriptive statistics, normality test, comparability test, and paired-simple t-test with asignificant level of 5%.Total ergonomic intervention has resulted in a decrease of room temperature from280 C to 25.830 C (p<0.05), increase in light intensity from 110 lux to 136.67 lux, decreasein eye fatigue from 81% to 23% (p<0.05), decrease in general fatique 88% to 41%,decrease in musculoskeletal complaints from 51% to 11% (p<0.05), increase in learningachievement score from 59.5% to 89.5% (p<0.05), increase in performance from 16.25%to 41.25%, and increase in efficiency from 10.09% to 75.09% (p<.05).The results of this study revealed that appropriate total ergonomic intervention in acomputer laboratory had succeeded in improving the quality of working and performanceof the workers.
Manajemen Energi Di Rumah Sakit Surya Husadha Denpasar Weda Setyawan, I Putu Gde; Sari Hartati, Rukmi; Kumara, INS
Majalah Ilmiah Teknologi Elektro Vol 11 No 2 (2012): (July - Decenber) Majalah Ilmiah Teknologi Elektro
Publisher : Universitas Udayana

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (543.882 KB)

Abstract

Rumah Sakit Surya Husadha Denpasar merupakan rumah sakit berstandar internasional dengan tingkat hunian kamar pada tahun 2011 cukup tinggi sekitar 75%.Yang berdampak pada tingkat pemakaian energi listrik. Tingkat pemakaian energi listrikrumah sakit tiap bulan rata-rata sebesar 123,071 kWh, diperuntukan pengoperasian AC sebanyak 43%, peralatan medis 29%, lampu 13%, elektronik 11% dan lainnya 4%. Dalam hal ini konservasi energi yang dilakukan difokuskan pada AC dan lampu karena hal tersebut memungkinkan untuk dilakukan pengontrolan pemakaian, penggantian peralatan dan tidak termasuk kategori peralatan vital seperti halnya peralatan medis. Dari tahapan audit energi diperoleh data bahwa nilai IKE adalah 245,40 kWh/m2/tahun. Sebanyak 37,1% kapasitas AC dan 84,54% kuat pencahayaan telah sesuai dengan pembebanan ruangan dan pedoman pencahayaan rumah sakit. Untuk perancangan manajemen energi, pimpinan rumah sakit belum memiliki acuan penyusunan sehingga perlu dilakukan pemetaan terhadap kebijakan dan sistem, organisasi, motivasi, sistem informasi, promosi dan investasi. Rancangan manajemen energi yang disusun mengacu pada matriks manajemen energi. Hasil matriks manajemen energi menunjukan bahwa manajemen energi rumah sakit belum terkelola dengan baik namun dalam hal penerapan teknologi dan sistem perawatan lampu dan AC dapat dijadikan best practice.
OPTIMASI PENEMPATAN RECLOSER UNTUK MEMPERBAIKI KEANDALAN PADA PENYULANG LEMBONGAN MENGGUNAKAN METODE PARTICLE SWARM OPTIMIZATION-FUZZY Luis da Costa, Jaime; Sari Hartati, Rukmi; Setiawan, Widyadi
Jurnal SPEKTRUM Vol 5 No 2 (2018): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (730.685 KB) | DOI: 10.24843/SPEKTRUM.2018.v05.i02.p16

Abstract

In Bali, especially at Tiga Nusa, the need for electricity is increasing along with the development of the construction of resorts and hotels. In this study, a sample of cases was taken in 2014 regarding the Lembongan feeder network system which was still installed with several LBS (Load Break Switch) which used to localize interference. Therefore, to anticipate interference and improve the reliability of feeders, one of many ways is to add an automatic back cover (recloser). This study aims to determine the optimal recloser location in the Lembongan feeder by using a combined method of fuzzy logic and particle swarm optimization with the help of MATLAB software. The results of this study obtained the best location of the recloser in group 5, namely the area between LBS SD 3, LBS Celagi Empak, and LBS Lembongan by adding one recloser. The SAIFI value is 1,9471 times / customer / year and the SAIDI value is 1,4596 hours / customer / year where the world class service parameter standard for the SAIFI reliability index is 3 times / customer / year and the SAIDI reliability index is 2,5 hours / customer / year.
Pengaruh Injeksi Daya Aktif Terhadap Keandalan Penyulang Winantara, Gesta; Sari Hartati, Rukmi; Sukerayasa, I Wayan
Majalah Ilmiah Teknologi Elektro Vol 12 No 1 (2013): (January - June) Majalah Ilmiah Teknologi Elektro
Publisher : Universitas Udayana

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (192.003 KB)

Abstract

Peningkatan kesejahteraan masyarakat berimplikasi terhadap peningkatan kebutuhan tenaga listrik. Peningkatan pasokan tenaga listrik harus dibarengi dengan tingkat keandalan yang sesuai standar, sehingga masyarakat pengguna dapat menikmati energi listrik  dengan kualitas yang memuaskan. Kualitas layanan dapat dilihat dari lamanya pemadaman dan seberapa sering pemadaman terjadi dalam satu satuan waktu. Indeks keandalan merupakan ukuran keandalan yang dinyatakan dalam besaran probabilitas. Keandalan suatu penyulang dipengaruhi oleh banyak faktor, baik faktor internal maupun faktor eksternal. Trend sistem distribusi menunjukkan semakin banyak penyulang yang mendapat sumber tambahan dari pembangkit-pembangkit kecil,  dengan sumber energi primernya   energi terbarukan yang disebut pembangkit tersebar (DG). Dalam penelitian ini dilakukan analisis bagaimana pengaruh DG  terhadap keandalan penyulang.  Penyulang Serangan merupakan salah satu penyulang yang mendapat pasokan sumber dari pusat pembangkit  tenaga sampah (DG). Dari hasil analisis pada penyulang ini didapatkan nilai indeks titik beban (load point), SAIFI dan SAIDI yang lebih baik dari sebelum masuknya pembangkit tenaga sampah.
ANALISA ALIRAN DAYA OPTIMAL PADA SISTEM KELISTRIKAN BALI Meilandari, Etis; Sari Hartati, Rukmi; Sukerayasa, I Wayan
Majalah Ilmiah Teknologi Elektro Vol 11 No 1 (2012): (January - June) Majalah Ilmiah Teknologi Elektro
Publisher : Universitas Udayana

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (716.898 KB)

Abstract

Bali saat ini merupakan daerah dengan tingkat pertumbuhan yang cukup pesat, Hal ini tentu saja memicu permintaan akan kebutuhan listrik yang semakin meningkat. Agar tetap dapat melayani permintaan akan kebutuhan listrik tersebut ketersediaan pasokan listrik harus berlangsung secara kontinyu. Metode optimasi aliran daya dengan fungsi tujuan untuk meminimalkan biaya pembangkitan dengan tetap memenuhi keseimbangan beban serta tidak melanggar kendala yang ditentukan diantaranya batas atas dan bawah daya aktif, daya reaktif serta tegangan pada suatu sistem kelistrikan telah banyak dciptakan dan dilakukan salah satunya adalah metode optimasi aliran daya dengan menggunakan Interior Point Optimal Power Flow (IP OPF) A Primal Dual Algorithms with Barrier Function. Hasil optimasi aliran daya yang dilakukan pada sistem kelistrikan Bali dengan meminimalkan biaya pembangkitan didapat penurunan Fuel Cost sebesar Rp.119,940,584.11 selama satu jam pada saat beban puncak malam Sehingga dapat disimpulkan hasil dari metode optimasi aliran daya cukup memuaskan dan dapat digunakan untuk analisa optimasi pada sistem kelistrikan Bali.
APLIKASI METODE PARTICLE SWARM OPTIMIZATION UNTUK OPTIMASI PENEMPATAN DAN JUMLAH PEMASANGAN KAPASITOR PADA PENYULANG BLAHKIUH Darma Satika, I Wayan; Sari Hartati, Rukmi; Setiawan, Widyadi
Jurnal SPEKTRUM Vol 6 No 4 (2019): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (202.516 KB)

Abstract

Penyaluran daya listrik di kawasan Badung Tengah dan Badung Utara disuplai oleh Penyulang Blahkiuh yang bersumber dari Trafo-IV 10 MVA Gardu Induk Kapal. Penyulang ini berbentuk konfigurasi jaringan distribusi 20 kV tipe radial dengan 172 bus. Rugi-rugi Penyulang Blahkiuh sebesar 0,150 MW. Untuk mengurangi rugi-rugi daya pada penyulang Blahkiuh maka dilakukan pemasangan kapasitor. Dalam paper ini dilakukan pemasangan 1 kapasitor sebesar 600 kVAR di Penyulang Blahkiuh. Dalam menentukan lokasi pemasangan kapasitor digunakan metode Particle Swarm Optimization (PSO).Berdasarkan analisa yang telah dilakukan dengan menggunakan metode Particle Swarm Optimization diperoleh bahwa lokasi optimal dalam pemasangan kapasitor terdapat pada Bus 28. Pemasangan kapasitor pada Bus terjadi penurunan rugi-rugi daya pada Penyulang Blahkiuh dari 0,150 MW menjadi 0,087 MW. Tegangan terendah pada bus 0,9430 p.u.
Peramalan Beban Listrik Harian dengan Metode Adaptive Neuro Fuzzy Inferrence System Sidemen, I G.M.W. Meindra; Sari Hartati, Rukmi; Linawati, Linawati
Majalah Ilmiah Teknologi Elektro Vol 13 No 1 (2014): (January - June) Majalah Ilmiah Teknologi Elektro
Publisher : Universitas Udayana

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (140.481 KB)

Abstract

Peningkatan kebutuhan tenaga listrik di Indonesia khususnya di Bali terjadi seiring dengan meningkatnya kegiatan ekonomi dan kesejahteraan masyarakat.  Peningkatan kebutuhan tenaga listrik memerlukan suatu perencanaan sistem tenaga listrik yang tepat. Perencanaan yang baik bisa dilakukan melalui peramalan yang tepat untuk kebutuhan beban listrik. Peramalan berdasarkan rentang waktu dikategorikan menjadi peramalan jangka pendek, jangka menengah dan jangka panjang. Salah satu metode dalam sistem cerdas yang dapat digunakan untuk peramalan beban adalah metode adaptive neuro fuzzy inference sistem (ANFIS). Pada penelitian ini, metode tersebut digunakan untuk peramalan beban listrik jangka pendek atau harian. Data yang dipergunakan untuk pembelajaran pada peramalan ini adalah data sebenarnya (actual data) yang diambil dari PT.PLN (Persero) Area Pengatur Distribusi Bali, mulai dari bulan Juni 2011 sampai dengan Agustus 2011 dan Desember 2012 sampai dengan Februari 2013. Pembangunan Model ANFIS menggunakan program Matlab. Fuzzy Inference System yang digunakan adalah tipe Takagi-Sugeno orde satu, dengan membership function yaitu time (jam), data histori beban listrik sebelumnya, kondisi hari sebelumnya (hari kerja atau hari libur) dan kondisi hari ini (hari kerja atau hari libur) masing-masing berjumlah 7, 10, 2 dan 2 dengan tipe fungsi keanggotan gbellmf. Penelitian ini menghasilkan nilai MAPE terbesar yaitu 9,92% yang terjadi pada bulan Juni 2011 yang nilainya lebih baik dibandingkan dengan metode JST backpropagation. Jadi metode peramalan beban listrik harian  menggunakan metode ANFIS cukup akurat.