p-Index From 2015 - 2020
0.983
P-Index
This Author published in this journals
All Journal AGREGAT
Bambang Kiswono, Bambang
Unknown Affiliation

Published : 5 Documents
Articles

Found 5 Documents
Search

Studi Perbaikan Balok Beton Bertulang Menggunakan Glass Fibre Reinforced Polymer (Gfrp) Untuk Meningkatkan Kekuatan Tarik Pada Bending Momen Kiswono, Bambang; Jayanto, Edy
AGREGAT Vol 2, No 2 (2017)
Publisher : Universitas Muhammadiyah Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

AbstractStudy analysis increase flexture capasity strength reinforced concrete beam and plate with method convensional very difficult site and time schedule make alternative method precise, acceleration time with use Fibre Reinforced Polymer (GRP), There is marketing Glass Fibre Reinforced Polymer, Aramid Fibre Reinforced Polymer, and carbon fibre reinforced Polymer. This product still import from japan, Germany, chinese. This analisys method carbon fibre reinforced polymer study research at building Barbara 6th floor .Test concrete strength with core drill, UPV(Ultrasonic Pulse Velocity) and Profometer.for coredrill 5 point, UPV 10 point, Profometer 10 point.quality concrete K250, analisis data arithmetic reinforced concrete without GFRP sheet and uses GFRP sheet of 2 layers until 5 layers. Keywords: strength flexture,beam and plate,test sample cylinder laboratory,GFRP sheets.  AbstrakStudi analisis peningkatan perkuatan kapasity lenturr pada balok dan plat dengan metode konvensional sangat menyulitkan saat pelaksanaan dilapangan dan waktu sangat menentukan, sehingga alternative dipakai  metode teknologi tepat guna karena adanya percepatan waktu seperti penggunaan  Fiber Reinforced Polymer , ada beberapa jenis yang ada dipasaran Glass Fiber Reinforced Polymer , Aramid Fiber Reinforced Polymer dan Carbon Fiber reinforced Polymer. Produk ini masih berasal dari jepang, Jerman, Cina dalam analisis ini digunakan alternative metode Carbon fiber Reinforced Polymer. Pada studi penelitian di gedung wisma Barbara lantai 6, sebagai bahan acuan pada bangunan existing dilakukan test uji dengan core drill, UPV (Ultrasonic pulse velocity) dan profometer . dilakukan test coredrill 5titik, UPV 10titik, Profometer 10titik.Dengan batasan yang diperlukan untuk perbaikan struktur menggunakan mutu beton K250, Analisis data perhitungan  antara beton tanpa GFRP dan memakai GFRP. 2 lapis. Hingga 5 lapis. Kata kunci: perkuatan lentur balok dan plat beton  bertulang,uji sampel beton silinder laboratorium, lapisGFRP 
Studi Kekuatan momen lentur Tiang Pancang Group Terhadap Beban Tumbukan Pada Breasthing Dolphin Dengan kapal tanker 50.000 Dwt di lamongan oil tanker terminal Kiswono, Bambang
AGREGAT Vol 2, No 1 (2017)
Publisher : Universitas Muhammadiyah Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Study analysis planning and design pile group, impact force from berthing tankers 50.000DWT, breasthing dolphins require so that absorb by horizontal and vertical loading, this pile resistance deflects a distance of y1 at a depth of z1. Type structure design terminal jetty with impact lateral breasthing dolphin and mooring dolphin. This pile cap with case-in- place concrete Materials for steel pipe pile in jetties with ASTM A252 Grade 3 out side diameter 800mm thick 16mm and out side diameter 900mm thick 12mm,length pile consist 2 joint are connected,bottom 12m, middle12m,upper12m soil test laboratory result from ITS using bor log BH2 appropriate location jetty. Analysis the main parameter to take from the soil ia a reaction modulus by modelled P-Y curve.with program Group 8 (Ensoft, 2010) Using absorb fender from trelleborg marine or sumitomo marine.. type SCN 1400 ,E = 139 Tm, R =163 T this loading at the fix head of pile resistance bending moment The final result ϕ=900mm,t=9mm and ϕ=800mm,t=12mm maintenance by cathodic.protection to enable them resist corrosion in sea water.
Pengaruh Rencana Gempa Metode “Response Spectrum Analysis” pada Perencanaan Struktur Gedung Rumah Sakit 6 Lantai di Palembang Nursandah, Arifien; Kiswono, Bambang; ., Satriadi
AGREGAT Vol 3, No 1 (2018)
Publisher : Universitas Muhammadiyah Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

AbstractThe hospital is a public service building in the health sector located in Palembang. This building consist of 6TH (sixth) floor with a total building height of ± 28 meters, with code SNI 1726 : 2012, this building is design using dynamic procedures (spectrum response). Based on the result of the SPT (Standard Penetration Test) soil investigation, this building is located on the surface of the silt with a classification of soil sites as SE. The structural system applied to withstand earthquakes in this building uses a Special Momen Resisting Frame System (SRPMK) which basically has full ductility and must be used in high seismic risk zones.The modificationdesign made to this are roofing at elevation + 26 meters, where the initial design using steel structures was modified using reinforced concrete structures, this modification was done to obtain a reinforced concrete structure design with long spans.Keywords: Design Structure, Spectrum Response, SRPMK.AbstrakRumah Sakit merupakan gedung pelayanan publik dibidang kesehatan yang terletak di Palembang.Gedung ini terdiri dari 6 (enam) lantai dengan tinggi total bangunan ± 28 meter, dengan mengacu ketentuan SNI 1726:2012, gedung ini direncanakan dengan menggunakan prosedur dinamis (respons spektrum). Berdasarkan data hasil penyelidikan tanah SPT (Standart Penetration Test), bangunan ini berada di permukaan tanah lanau ke lempungan dengan klasifikasi situs tanah sebagai situs SE. sistem struktur yang diterapkan untuk menahan gempa dalam bangunan ini menggunakan Sistem Rangka Pemikul Momen Khusus (SRPMK) yang pada dasarnya memiliki daktilitas penuh dan wajib digunakan di zona resiko gempa yang tinggi. Perubahan yang dilakukan pada perencanaan ini yaitu lantai atap pada elevasi + 26 meter, yang mana rencana awal yang menggunakan struktur baja dilakukan modifikasi menggunakan struktur beton bertulang, modifikasi ini dilakukan untuk mendapatkan perencanaan struktur beton bertulang dengan bentang yang panjang.Kata Kunci: Perencanaan Struktur, Respons Spektrum, SRPMK.
Perencanaan Struktur Dermaga Peti Kemas Kapet Batulicin, di Kalimantan Selatan Abidin, Zainal; ., Fahrurarid; Kiswono, Bambang
AGREGAT Vol 3, No 1 (2018)
Publisher : Universitas Muhammadiyah Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

AbstractThe KAPET Batulicin area which has been designated as a National Strategic Area (NSA) based on PP No.26 of 2008, has the potential to develop superior commodities based on natural resources, especially plantations, production forests, iron or mining, and aquaculture and capture. But unfortunately the infrastructure (port), especially the port serving containers is still unavailable. The existing port is a port that serves coal transportation and is owned by private parties. So it is necessary to plan a container dock that is expected to be able to support economic progress and prosperity in the Batulicin region. This dock is planned to be able to serve container ships with a maximum draft of 50,000DWT. This type of dock structure is an open wharf with trestle as a link between the stacking field and the pier. Pile foundation using JIS A 5525 steel piles. In planning this dock structure, the structural system is analyzed using the SAP2000 program with 3D models. The loading and reinforcement of the structure is controlled based on SNI regulations and BMS 1992. From the results of the design planning is obtained, the dock consists of a jetty head building and 2 trestles. The dimensions of the jetty head are 720m long and 50m wide. The dimensions of the pier beam are 80cm wide and 120cm high, while the pile dimensions are 1016mm diameter, 19mm thick and 20.65m long for upright piles and 20.75m for tilting piles with 6V: 1H slope ratio. The pile cap dimension for a single pole is 1.5x1.5x1.2 m. Pile cap dimensions for double poles are 3x1,4 x1,4 m. The structure used is the fender type V 400 H and the BR-150 bollard structure.Keywords: Port, Dock, Container, PileAbstrakWilayah KAPET Batulicin yang telah ditetapkan sebagai Kawasan Strategis Nasional (KSN) berdasarkan PP No.26 Tahun 2008, memiliki potensi pengembangan komoditas unggulan berbasis pada sumber daya alam, terutama perkebunan, hutan produksi, pertambangan bijih besi, serta perikanan budidaya dan tangkap. Namun sayangnya prasarana (pelabuhan) khususnya pelabuhan yang melayani peti kemas masih belum tersedia. Adapun pelabuhan yang sekarang ada merupakan pelabuhan yang melayani pengangkutan batu bara dan meruapakan milik pihak swasta. Sehingga perlu adanya perencanaan dermaga peti kemas yang diharapkan akan mampu menunjang kemajuan perekonomian dan kesejahteraan di wilayah Batulicin. Dermaga ini direncanakan mampu melayani kapal petikemas dengan draft kapal maksimal 50.000DWT. Tipe struktur dermaga ini adalah wharf terbuka dengan trestle sebagai penghubung antara lapangan penumpukan dengan dermaga. Tiang pondasi menggunakan tiang pancang baja JIS A 5525. Dalam perencanaan struktur dermaga ini, sistem struktur dianalisis dengan menggunakan program SAP2000 dengan model 3D. Pembebanan dan penulangan struktur dikontrol berdasarkan peraturan SNI dan BMS 1992. Dari hasil perencanaan desain didapatkan, dermaga terdiri dari bangunan jetty head dan 2 buah trestle. Dimensi dari jetty head yaitu panjang 720m dan lebar 50m. Dimensi balok dermaga yaitu lebar 80cm dan tinggi 120cm, sedangkan dimensi tiang pancang diameter 1016mm, tebal 19mm serta panjang 20,65m untuk tiang pancang tegak dan 20,75m untuk tiang pancang miring dengan perbandingan kemiringan 6V : 1H. Dimensi pile cap untuk tiang tunggal yaitu 1,5x1,5x1,2 m. Dimensi pile cap untuk tiang ganda yaitu 3x1,4 x1,4 m. Pada struktur sandar yang dipakai adalah Fender tipe V 400 H L=200 serta struktur bollard BR-150.Kata kunci: Pelabuhan, Dermaga, Petikemas, Tiang pancang
Perencanaan Struktur Gedung Perkantoran Dengan Sistem Rangka Pemikul Momen Khusus Berdasarkan Sni 2847-2013 di Bantul – Yogyakarta Muafandi, Sonif; Nursandah, Arifien; Kiswono, Bambang
AGREGAT Vol 4, No 1 (2019)
Publisher : Universitas Muhammadiyah Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

AbstractThe design of reinforced concrete structures in the structure of  PT. Indomarco Prismatama's office buildings in Bantul aimed to find out. (1) Dimensions of beams and columns that can withstand earthquake loads. (2) Detailed image of beam reinforcement and column from planning results.In this final project, the structure of reinforced concrete building was planned by using the Special Moment Resisting Frame System (SRPMK) SNI 2847- 2013. Where the building of the Special Moment Resisting Frame System (SRPMK) used Strong Column and Weak Beam. The planned structure was a 6-story office building that was reviewed by using spectrum response analysis.In the Special Moment Resisting Framework System that showed beams B1 (400x600) with ϼ = 2.06%; beam B2 (350x500) with ϼ = 2.17%; beam Ba1 (250x350) with ϼ = 2.17%; Ba2 beam (200x300) with ϼ = 2.53%; Column K1 (600x600) with ϼ = 2.18%; K2 (500x500) column with ϼ = 2.43%; Keywords: Building Structure, SRPMK, strong column weak beam. AbstrakPerancangan struktur beton bertulang pada struktur bangunan perkantoran PT.Indomarco Prismatama diBantul ini bertujuan untuk mengetahui. (1) Dimensi balok dan kolom yang mampu menahan beban gempa. (2) Gambar detail penulangan balok dan kolom dari hasil perencanaan.Dalam tugas akhir ini akan direncanakan struktur gedung beton bertulang menggunakan Sistem Rangka Pemikul Momen Khusus (SRPMK) SNI 2847- 2013. Dimana bangunan model Sistem Rangka Pemikul Momen Khusus (SRPMK) akan menggunakan Strong Column and Weak Beam (kolom kuat dan balok lemah). Struktur yang akan direncanakan adalah gedung perkantoran 6 lantai yang ditinjau dengan menggunakan analisa respons spektrumPada Sistem Rangka Pemikul Momen khusus, diperoleh balok B1 (400x600) dengan ϼ= 2.06%; balok B2 (350x500) dengan ϼ= 2.17%; balok Ba1 (250x350) dengan ϼ= 2.17%; balok Ba2 (200x300) dengan ϼ= 2.53%; Kolom K1 (600x600) dengan ϼ= 2.18%; Kolom K2 (500x500) dengan ϼ= 2.43%; Kata kunci : Struktur Gedung,  SRPMK, strong column weak beam.