Claim Missing Document
Check
Articles

Found 2 Documents
Search

COMPARISON OF CONVENTIONAL SLAB AND METAL DECK COMPOSITE SLAB METHOD TO TIME AND COST IN TRANSPARK CIBUBUR PROJECT Handayani, Anjas; Reza, Mochamad Elvan
Neutron Vol 20 No 01 (2020): JULY 2020
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/neutron.v20i01.49

Abstract

in the implementation of the Transpark Cibubur project, especially in Tower C Apartment there are several problems in conventional slab methods including the need for a longer construction time. With some thoughts and considerations, the work method of floor slab was changed from conventional method to metal deck composite slab method. In this research, a comparative of conventional slab and metal deck composite slab method in Tower C of the Cibubur Transpark Project is the object of research to compare the two methods to speed of implementation and cost requirements. The analysis results show in Tower C 16th to 19th floor for metal deck composite slab method is more expensive than conventional slab method with a cost difference Rp. 137.252.215,54. While in terms of work time, conventional slab method are longer than metal deck composite slab method with a time difference for 25 days.
ANALYSIS OF SUPPLY CHAIN MANAGEMENT PERFORMANCE USING SCOR AND AHP METHODS IN GREEN AVENUE APARTMENTS OF EAST BEKASI Handayani, Anjas; Setyatama, Christianto Yuppie
Journal of Applied Science, Engineering, Technology, and Education Vol. 1 No. 2 (2019)
Publisher : Yayasan Ahmar Cendekia Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35877/454RI.asci1241

Abstract

This study analyzes the performance of a company's supply chain as measured by an approach using the SCOR method or the Supply Chain Operations Reference. SCOR is divided into 5 basic supply chain management processes, namely plan, source, make, deliver and return. Due to schedule delays of 3%, it is affected by the late delivery of raw materials ordered from suppliers and the quality of raw materials is below standard. Performing a performance measurement approach is also supported by the Analytical Hierarchy Process (AHP) method to determine the weight of each performance indicator and is calculated using the Expert Choice v11 program in this study. The purpose of this study was to determine how much value the PT Adhi Commuter Properti supply chain performance and what performance indicators should be improved. The results of the study resulted in a 75.444 overall supply chain performance achievement score of the GOOD category in achieving total company performance appraisal and priority improvement recommendations of 4 performance indicators that are expected to help improve the company's supply chain performance, namely the fulfillment of raw materials, structures, defective products and demand that the company can fulfill.