Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : Jurnal JEETech

Optimasi Kualitas Tenaga Listrik Di Area Banyuwangi Menggunakan Radio Gateway Over Internet Protocol Machrus Ali; Dwi Ajiatmo; Al Hadid Zulkarnain; Muhlasin
Jurnal JEETech Vol. 1 No. 2 (2020): Oktober 2020
Publisher : TE-UNDAR

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.48056/jeetech.v1i1.3

Abstract

One of the communication problems at PLN is communication in areas that are not covered by radio frequencies. With the limitation related to radio frequency because the blankspot can have an impact on the speed of service, both in terms of recovering when disturbances occur, communication for coordination between officers, and maintenance work. Meanwhile, efforts to expand radio frequency coverage areas by building tower repeater links and BTS tower rentals require relatively large costs. Information technology that is developing now makes it easy for everyone to communicate through various media, one of which is an internet connection. Widespread development of infrastructure owned by telecommunications providers, the wider availability of internet connections in the blank spot area. To overcome the blank spot areas that have an impact on SAIDI and SAIFI, Radio Gateway Over Internet Protocol is used in the working area of ​​PT. PLN (Persero) Banyuwangi area that connects communication radios with mobile phones through the internet network. From the calculation using the average formula in the Microsoft Excel program the average value of SAIDI is better than before. Meanwhile, the average SAIFI score afterwards is also better than before. By using the T-Test test analysis it is known that the calculated t value is better, and for SAIFI it is known that the calculated SAIDI data is also better.
Analisis Perencanaan Investasi Jaringan Tenaga Listrik Dwi Ajiatmo
Jurnal JEETech Vol. 1 No. 2 (2020): Oktober 2020
Publisher : TE-UNDAR

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.48056/jeetech.v1i2.11

Abstract

Electricity is able to make a positive change and contribution to people's lives and well-being. This study aims to assess the feasibility of investment in the construction of low voltage electricity networks. The method used with project evaluation analysis is based on financial analysis. The criteria used to analyze activities carried out for 10 years use payback period (PP) analysis, net present value (NPV), internal rate of return (IRR), and profitability index (IP). The results showed that the analysis of investment planning can be carried out with the consequence of the results obtained in the form of not so large returns. PP results show the investment value with the payback period method will Return in the 9th year, while the positive NPV value is still above zero while the IRR value shows the value of 11% below the social discount rate as well as the IP value showing the value of 0.90. The feasibility of investment in terms of economic-financial analysis by looking at per criteria shows that investment is still feasible to be carried out with minimal profit levels.