cover
Contact Name
Achmad Muchayan
Contact Email
achmad.muchayan@narotama.ac.id
Phone
+6285732060053
Journal Mail Official
ijeeit@narotama.ac.id
Editorial Address
NAROTAMA UNIVERSITY, Indonesia AR HAKIM 51 SURABAYA JAWA TIMUR www.narotama.ac.id
Location
Kota surabaya,
Jawa timur
INDONESIA
IJEEIT (International Journal of Electrical Engineering and Information Technology )
ISSN : 26152088     EISSN : 26152096     DOI : https://doi.org/10.29138/ijeeit.v3i2
is an open-access journal publishing original research from across all areas of the Electrical Engineering and Information Technology We offer our authors a highly respected home for their research. Partnering with our extensive network of expert peer reviewers, our editorial team provides rigorous, objective and constructive peer review, and will support you throughout the publication process. We led by the same ethical and editorial policy guidelines to ensure that all the research we publish is scientifically robust, original, and of the highest quality. We help your research reach more people and maximize its impact. As an open-access journal, we ensure that your work is immediately accessible and highly discoverable across a range of channels Focus and Scope IJEEIT publishes original research from all areas of the Electrical Engineering and Information Technology
Articles 29 Documents
PLANNING OF THE SANITARY LANDFILL SYSTEM IN SURAKARTA CITY Anwar, David; Edy Santosa, Rosslan
IJEEIT : International Journal of Electrical Engineering and Information Technology Vol 3 No 1 (2020): March 2020
Publisher : NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijeeit.v3i1.1158

Abstract

Waste processing sites have a sueful life, as the activities and populations increase in the Surakarta City has led to increasing volume of the garbage that come to landfill every day. Putri Cempo’s Landfill operation system still uses the conventional system, called open dumping. This system causes accumulation of garbage increasingly mountainous and not polluted. Therefore, a system called sanitary landfill is planned to increase landfill capacity and extend the life of landfill.The purpose of this final project is to plan the development of landfill in Surakarta City with a sanitary landfill system. This development is made by making landfill cell in lieu of the open dumping system. The method of landfill cell waste using the trench method to further optimize landfill cell land.The development of TPA using a sanitary landfill was carried out in an area of 6.7 Ha. With the prediction of the amount of waste entering the landfill in 2026 around 15.041 tons/year. The age of using landfill is predicted to range from 5 years and the drainage size used is 50x50 and 100x50 made from river stone for around the landfill and made from precast cell for around the facilities building
ANALYSIS OF TRAFFIC ACCIDENTS IN THE DISTRICT GRESIK (Case Study: Road Duduksampeyan Sta km 16 + 000 - Sta km 16 + 500) Fariska, Debi; Mudjanarko, Sri Wiwoho
IJEEIT : International Journal of Electrical Engineering and Information Technology Vol 3 No 2 (2020): September 2020
Publisher : NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijeeit.v3i2.1157

Abstract

Traffic accident is an accident that occurs unexpectedly and unintentionally involving a vehicle which resulted in casualties and material damage. The problem of traffic accidents on the road Duduksampeyan Sta km 16 + 000 - Sta km 16 + 500 is the most significant. The purpose of this study was conducted to determine the level of traffic accidents that occurred in 2013-2018. This study uses a method that refers to the calculation of the number of accidents. The observations in the field of road safety facilities are still inadequate, lighting is in only one side of the road as much as ± 10 pieces, and the absence of traffic signs (speed limits, accident-prone areas, etc.). The volume of daily traffic averages on these roads as much as 3833 veh / hour. The results of the analysis carried accident rate by 158 the highest annual accident / km occurred in 2018. Meanwhile, based on the fatality index, it was 47.76%, the highest in 2013.
PLANNING OPTIMIZATION PLANNING IRIGATION AREA OF SOLOK SUMATERA WEST REGENCY Hidayat, Acep; Ferdina, Deri
IJEEIT : International Journal of Electrical Engineering and Information Technology Vol 2 No 2 (2019): September 2019
Publisher : NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijeeit.v2i2.1156

Abstract

Solok Regency irrigation network planning which has an area of irrigation land of 3738 ha. The main canals are spread in several areas, namely 43 Irrigation Channels, 17 Dams, 7 Reservoirs and 2 lakes which are still functioning in Solok Regency. The poverty rate in Solok Regency is still quite high, reaching 27,487%. The data includes secondary data on 10-year rainfall data from KayuAro, Bayur Maritime Bay Methodology, Padang Panjang Geophysics and 10-year climatology from KayuAro Climatology Station. The calculation method used is the intensity of theissen rainfall method, Evapotranspiration of the modified Penman method, the reliable discharge of the DR.FJ Mock method, the cropping pattern, and the need for irrigation water. The most efficient and optimal planting pattern obtained is PADI-PADI-CORN with large irrigation water requirements in tertiary plots (NFR tertiary plots) ranging from 0 - 1,546 ltr / sec / ha with a maximum of 1,546 ltr / sec / ha in September II, whereas Irrigation water demand in the intake (DR intake) ranges from 0 to 2,378 ltr sec / ha with a maximum of 2,378 ltr / sec / ha in September II.The mainstay discharge available in the Pauh Tinggi Irrigation Network Planning is very abundant with the mainstay discharge (Q80) for irrigation, the maximum mainstay discharge (Q80) occurs in April I with 10.482 ltr / sec / ha and minimum in December II with 3,930 ltr / sec / ha. Based on the mainstay discharge results above it can be stated that the water balance / water balance between the mainstay discharge Q80 and the need for irrigation water experienced a large surplus
SAFETY AND SECURITY STUDIES OF RAILWAY LINES WITH PUBLIC ROADS (CASE STUDY OF RAILROAD CROSSING IN THE KENJERAN ROAD OF SURABAYA CITY) Mahmudi, Irwan; Mudjanarko, Sri Wiwoho
IJEEIT : International Journal of Electrical Engineering and Information Technology Vol 2 No 2 (2019): September 2019
Publisher : NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijeeit.v2i2.1154

Abstract

Railways are a mode of transportation that is being liked by the public because of its efficiency. The train has its own road in the form of rails, it doesn’t mean the train doesn’t intersect other transportation. The train crossing is a conflict area for public road users with train. This includes train crossing at Kenjeran street. The kenjeran street itself is a national road that is quite strategic because it is one of the accesses to the Surabaya-Madura toll road. The research this time aims to find out the security aspects that must be improved at the train crossing kenjeran street. Including rider behaviour at the time of the train crossing. The method used for this research is direct observation of the field and also shares questionnaires to find out if a public road user understands regulations while on a train crossing. The research results of many signs or road markers are incomplete so that many road users do not know that in front of the train crossing. Other public road user behaviour is also a lot of offense.
ANALYSIS SCHEDULING PROJECT USING CPM METHOD (Case study : Project of the Surabaya Caspian Tower Apartment) Maprilana, Harjian; Koespiadi, Koespiadi
IJEEIT : International Journal of Electrical Engineering and Information Technology Vol 2 No 2 (2019): September 2019
Publisher : NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijeeit.v2i2.1155

Abstract

The success and failure of project implementation is often caused by poor planning and ineffective controls, so that project activities experience various obstacles such as the late completion of the project, the decline in the quality of work and the swelling of implementation costs. Project management is carried out to manage the project from the beginning of the project until the completion of the project properly. The case study in this study is PT. PP (Persero) Tbk. as the executing element of the construction work, it is in charge of organizing the construction of the Surabaya Caspian Tower Apartment in East Java. The CPM (Critical Path Method) method is used to find out how long a project has been completed and look for possible acceleration of project time. From the research using the CPM method, it can be seen that the normal duration of project completion is 453 days which can be optimized to 350 days. This can be done by giving special attention to activities included in the critical path and accelerating some activities by increasing the number of workers
THE EFFECT OF COMPENSATION, MOTIVATION, AND WORK SATISFACTION ON OJEK ONLINE DRIVER PERFORMANCE IN SURABAYA Kafid, Muhammad; Putra, Bayu Airlangga
IJEEIT : International Journal of Electrical Engineering and Information Technology Vol 2 No 2 (2019): September 2019
Publisher : NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijeeit.v2i2.1153

Abstract

The purpose of this study is to analyze the Influence of Compensation, Motivation, and Job Satisfaction on the Performance of Surabaya Regional Ojek Drivers Online. With a sample of 100 respondents. This research is quantitative and data collection through questionnaires and observations. Data analysis used is validity test, reliability test, classic assumption test, and multiple linear analysis test. The results showed that the Influence of the Effect of Compensation, Motivation, and Job Satisfaction on the Performance of Surabaya Regional Ojek Drivers on positive and significant results. The f test results were known at 214,590> f table 17,354 simultaneously. Partially compensation amounted to .211 t table 3,985 Significant effect on motivation of .119 t table of 2.689 has a significant effect on employee performance and job satisfaction of .253 t table 4.194 has a significant effect on employee performance
EFFECT OF THE EXISTENCE OF CITY PARK COMMUNITY SATISFACTION IN INFRASTRUCTURE DEVELOPMENT (CASE STUDY: CITY SURABAYA) Ayuningtyas, Nanda Putri; Edy Santosa, F. Rooslan
IJEEIT : International Journal of Electrical Engineering and Information Technology Vol 2 No 1 (2019): March 2019
Publisher : NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijeeit.v2i1.1150

Abstract

ANALYSIS OF PRODUCT QUALITY, SALES PROMOTION, BRAND IMAGES, AND AFTER-SALES SERVICE TOWARDS SAMSUNG GADGET PURCHASE DECISIONS Safitriani, Lina; Arimbawa, I Gedhe; Baktiono, Agus; Damayanti, Elok
IJEEIT : International Journal of Electrical Engineering and Information Technology Vol 2 No 2 (2019): September 2019
Publisher : NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijeeit.v2i2.1152

Abstract

This study aims to determine the effect of simultaneous and partial product quality, brand image, sales promotion and after-sales service on purchasing decisions of Samsung smartphones at the Discovery Mobile Store in Sidoarjo. This research used quantitative method. The population and sample based on the questionnaire distribution to consumers who visited the Discovery Ponsel Store Sidoarjo, and were taken as 135 respondents. Data collection techniques used interviews, observation and questionnaires. The data analysis used reliability test, validity test, classic assumption test and multiple linear analysis test. The simultaneous and partial results of product quality, brand image, sales promotion and after-sales service have a significant effect on the purchase decision of Samsung smartphones at the Discovery Ponsel Sidoarjo Store because of the significance of <0.005.
ANALYSIS AND DESIGN OF DRAINAGE SYSTEM PLANNING STUDY (CASE STUDY GRAHA WISATA SIDOARJO RESIDENTIAL) Reza, M. Fachrul; Wulandari, Diah Ayu Restuti
IJEEIT : International Journal of Electrical Engineering and Information Technology Vol 2 No 1 (2019): March 2019
Publisher : NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijeeit.v2i1.1149

Abstract

Graha Wisata Sidoarjo Housing has a land area of 470,000 m2 located in Lebo Village, Sidoarjo District, Sidoarjo Regency. The housing is passed by the Anak Afvoer Sidokare channel. With the change in land function, it is necessary to analyze the capacity of the Anak Afvoer Sidokare watershed. The rainfall data used is the annual maximum rainfall from the rain station Durungbedug, Ketintang, Sidoarjo, Sumput .. The method of rainfall analysis uses the Log Pearson type III method. Planned flood discharge in the Anak Afvoer Sidokare watershed at 25 years using the Nakayasu method is 450.55 m3 / sec while the existing Afvoer capacity with dimensions of 10 m x 4.172 m is 537.39 m3 / sec, the cross section of the Son Afvoer Sidokare channel is not overflow.
ANALYSIS OF PROJECT IMPLEMENTATION SCHEDULE USING MICROSOFT PROJECT (Case Study: Trenggalek City Square Area) Muttaqin, Muhammad Zainal; Hardaningrum, Farida
IJEEIT : International Journal of Electrical Engineering and Information Technology Vol 2 No 1 (2019): March 2019
Publisher : NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijeeit.v2i1.1148

Abstract

A project implementation schedule can be said to be successful if the implementation process can be completed in accordance with the planned time. Planning a good project implementation schedule must be supported by good project control. Because what happens in the field is not necessarily in accordance with what has been planned. By analyzing the cost and end time of project completion, it can provide detailed project performance schedule information. In this study, the analysis of the project implementation schedule is done manually, which is to make the S curve and use the Microsoft Project 2019 program. The method used is to enter the data related to the analysis into the program, then this Microsoft project will calculate automatically according to the formulas. calculation formula that has been made, so that the calculation of the project implementation schedule analysis will be faster and more accurate. The results of the cost analysis following the price of the Trenggalek district work unit for the renovation of the City Square is IDR. 6,078,136,530. Estimated schedule in planning the S schedule time curve with Microsoft Project 2019, there is a time difference of scheduling 39 calendar days or a difference of 1 month more that can save time and costs of implementing work. At the planning stage of scheduling with an S curve of 20 weeks or 140 days, using Microsoft Project 2019, the results obtained 101 days of project completion time. In the area of ornamental plants experiencing critical trajectory, due to the end of the work that is expected to be completed and handover, so it must add workers to be on target

Page 1 of 3 | Total Record : 29